Frequently Asked Questions About ADUs in Spring Valley
If you’re planning an accessory dwelling unit in Spring Valley, you probably have a short list of questions you want answered before anyone shows up at your door: what it costs, who’s doing the work, what happens if something goes wrong, and how long it takes. This page covers the ones we hear most. Every answer is written the way we’d explain it standing in your backyard, with real numbers where we can give them and a plain description of what’s in writing on every project.
A quick definition first, since it comes up constantly. An ADU (accessory dwelling unit) is a smaller, self-contained home on the same lot as your main house. It has its own entrance, kitchen, and bathroom, and someone lives in it full time. A JADU (junior ADU) is a smaller version that shares a bathroom with the main house and must stay within the existing footprint. A garage conversion turns what you already have into living space. All three are the work we do, and all three fall under The Kingswell Guarantee: a written price before work begins, a real arrival window, a clean job site, and a written guarantee on the finished job.
Key Takeaways
- Garage conversions in Spring Valley generally run $45,000 to $95,000. Detached ADUs run $150,000 to $350,000 depending on size and finish.
- You get a written price before any work starts. No changes at the door.
- Every project carries the 365-Day Done Right Promise and a written guarantee.
- Design and permitting are handled for you, including Clark County review.
- A live person answers the phone, 24 hours a day, seven days a week.
- Our technicians have up to 16 years of experience on ADU and conversion work.

Pricing & Estimates
How much does ADU work cost in Spring Valley?
ADU work in Spring Valley typically runs $45,000 to $95,000 for a garage conversion, $150,000 to $350,000 for a new detached ADU, and $35,000 to $75,000 for a JADU or interior conversion. The spread is wide because the cost is driven by square footage, foundation work, utility runs, and finish level, not by a flat rate. A 500-square-foot detached unit with a simple kitchen lands near the bottom of that detached range; a 900-square-foot unit with tile, custom cabinetry, and a full HVAC system pushes toward the top. We put a real number in front of you before anyone picks up a hammer, and that number holds.
What drives the price up or down on an ADU in Spring Valley?
Foundation conditions and utility trenching drive cost more than anything else on a Spring Valley lot. Our soil here includes caliche, that hard calcium-carbonate layer under the topsoil, and it slows excavation and can force a redesign of where the plumbing runs. Lots in the older parts of town sometimes need a panel upgrade before an ADU can be powered, and that adds a line item. Reusing an existing garage slab keeps cost down. So does picking a prefab unit from a manufacturer we work with. Choosing a covered porch over a second bathroom saves real money too.
Do you charge for estimates?
No, estimates are free. We come out, walk the lot, talk through what you want, and give you a written price. You’ll have that number in hand before you commit to anything. The estimate covers the scope we discussed, and if the scope changes after you see the number, we write a new one rather than adjusting the old one mid-project. Call (844) 780-4284 for a free estimate.
Is it cheaper to build an ADU or to convert the garage?
Converting the garage is almost always cheaper. A garage conversion reuses the slab, the walls, and the roof line, so you’re paying for insulation, electrical, plumbing, finishes, and a bathroom instead of an entire new structure. In Spring Valley, that usually means spending somewhere in the $45,000 to $95,000 range instead of $150,000 and up. The trade-off is size and privacy: a conversion is attached and limited by the existing footprint, while a detached unit gives you a separate structure. We’ll tell you plainly which one fits your lot and your budget rather than steering you toward the bigger job. Call (844) 780-4284 to talk through both options.
Can I finance an ADU project?
Yes, most of our clients finance some or all of a Spring Valley ADU. Common routes are a cash-out refinance, a home equity line of credit, or a construction loan arranged through a lender you choose. We don’t lend money and we don’t push a specific lender, but we can tell you what documentation a lender will typically ask for on a project of this size. Getting the written price early helps here, because lenders want a fixed scope to underwrite against. Call (844) 780-4284 and we’ll walk you through what the estimate needs to show.
Service & Scheduling
How long does an ADU project take in Spring Valley?
A garage conversion typically takes 3 to 5 months from permit approval to final inspection. A new detached ADU takes 6 to 10 months, and prefab units often sit at the shorter end because the shell is built off-site while we prepare the foundation. Permitting adds time before construction starts, and Clark County review on a residential ADU usually runs several weeks. We give you a written schedule and a defined arrival window, so you know when a crew is coming and what they’re doing that week. If a delay comes from our side, you hear it from us first.
Can you build an ADU in Spring Valley on a small lot?
In many cases, yes. Spring Valley lots vary a lot, and the setbacks and lot coverage rules decide what actually fits. Smaller detached units and garage conversions are usually the answer when the lot is tight, and a JADU can work when you’re squeezed against the property line. We’ll measure the lot and check the setbacks before we quote anything, so the number you get is for a unit that can actually be permitted.
Do you handle permits and inspections?
Yes, we handle the permitting and inspection process from start to finish. That includes drawing the plans, submitting to the county, coordinating with the utility providers, and scheduling the inspections the county requires. You don’t have to chase signatures or stand in line at a counter. The homeowner’s role is to sign the documents that legally require a property owner’s signature; everything else is on us.
What is the step-by-step process for building an ADU in Spring Valley?
Here is the sequence we follow on every project, from first call to final walkthrough.
- Free site visit and written estimate. We walk the lot, talk through your goals, and give you a written price for the scope we discussed.
- Design and plan set. We draw the plans for the unit you chose, whether that’s a garage conversion, a detached ADU, or a JADU, and align them with what the lot and the county will allow.
- Permit submission. We submit the plans to Clark County, respond to reviewer comments, and pay the permit fees as part of the project cost.
- Pre-construction walkthrough. Before work starts, we confirm the schedule, the arrival window, and the scope in writing, and answer any last questions.
- Construction. Foundation, framing, roofing, electrical, plumbing, HVAC, insulation, drywall, and finishes, in that order, with each trade inspected as required.
- Final inspection and walkthrough. We schedule the county final, walk the finished unit with you, and hand over the written guarantee.
- 365-Day Done Right Promise. If anything fails within the guarantee period, we come back and make it right. That commitment is written, not implied.
Do you work in the winter in Spring Valley?
Yes. Winter in Spring Valley is mild enough that construction rarely stops, though occasional rain can push a concrete pour by a day or two. We plan around the weather rather than pretending it won’t happen, and if a pour gets pushed, you get a revised arrival window in writing rather than a shrug. Summer heat is the bigger scheduling consideration here; crews start early and the work still gets done on schedule.

Licensing, Insurance & Guarantees
Are you licensed and insured?
Yes. Lodgewick ADU Builders Spring Valley works with licensed and insured tradespeople on every project, and we confirm credentials before anyone is scheduled on your job. We don’t hand work to whoever’s available that week. Background-checked, uniformed technicians show up on the job site, so you always know who’s on your property and what company they represent. If you want proof of licensing and insurance for the tradespeople assigned to your project, ask and we’ll provide it.
Do you guarantee your work?
Yes, every project carries a written guarantee. The 365-Day Done Right Promise means that if the work isn’t right, we come back and make it right at no charge. That commitment is delivered in writing before the work begins, so you’re not relying on a handshake. It covers the labor and materials we install. If something fails within the guarantee period, you get a free return visit. That’s the whole point of putting it in writing.
What is The Kingswell Guarantee?
The Kingswell Guarantee is the set of written commitments attached to every project: a written price before work begins, a defined arrival window, a clean job site, and a written guarantee on the finished job. We call the day-to-day behavior behind it The Kingswell Way: say the price before the work, show up in the window given, leave the place cleaner than we found it, put the guarantee in writing, and come back if it fails. Those aren’t slogans. They’re the thing you can hold us to, and if we miss, you have it in writing.
What happens if something fails after the job is done?
We come back and fix it. If a bathroom fixture, a door, or any part of the installed work fails within the 365-day guarantee period, call us and we schedule a return visit at no charge. You don’t have to argue about whether it’s covered; the guarantee spells out what’s covered and what isn’t before the work starts. A live person answers the phone 24/7, so if something goes wrong on the weekend, you reach someone who can get it scheduled.
What payment methods do you accept?
We accept checks, bank transfers, and most major credit cards. Payment is tied to the written schedule in your contract, not to someone knocking on your door asking for cash. We don’t accept cash payments outside the contract terms. If you need a particular arrangement for a project of a certain size, ask when we give you the estimate and we’ll tell you plainly what’s possible.
How do I know a quote won’t change after work starts?
You know because the price is in writing before any work begins. A written price is the first commitment in The Kingswell Guarantee, and it applies to every project, every time. If something genuinely unforeseen comes up, such as hidden water damage behind a garage wall or a slab that can’t support the planned structure, we stop, explain it, and write a new scope and price for you to approve before we continue. What we don’t do is add charges at the door.
Specific ADU Services
Do you build new detached ADUs?
Yes, we build new detached accessory dwelling units in Spring Valley. That includes site-built construction and prefab units from manufacturers we work with, including Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, and Tuff Shed. Prefab units arrive as a completed shell that we set on a foundation we prepare, which often shortens the on-site build time. Site-built units give you more freedom on layout and finishes. We lay out both options with real numbers and let you decide what fits your lot, budget, and timeline.
Do you handle garage conversion ADUs?
Yes, garage conversions are one of our most common Spring Valley projects. We convert the existing structure into a self-contained unit with a bathroom, kitchenette, insulation, and its own entrance. In Natomas-style subdivisions and along the older streets near Spring Valley, we regularly see conversion candidates where the slab is sound and the roof line is intact, which keeps costs closer to the $45,000 end of the range. If the garage needs a new slab or roof, we tell you before quoting rather than after.
Do you handle JADUs and interior conversions?
Yes, we handle junior ADUs and interior conversions. A JADU must sit inside the existing footprint of the home, share a bathroom with the main house, and stay under the size cap the county applies. In practice, most Spring Valley JADUs come from converting a spare bedroom, a portion of a large primary suite, or unused interior space into a self-contained living area. Cost usually lands between $35,000 and $75,000. Because the rules are specific, we confirm the design against the current county requirements before we quote.
Do you handle ADU design and permitting?
Yes, design and permitting are part of the service. We draw the plans in-house or with a licensed designer we work with, submit them to the county, and manage the review cycle. That covers site plan requirements, setback checks, utility coordination, and the inspections the unit will need as it’s built. Homeowners tell us this is the part they were dreading most, and it’s the part we take off their plate. If the county comes back with comments, we handle the responses.
Do you build home additions as well as ADUs?
Yes. Alongside ADUs we build home additions in Spring Valley, from bump-outs over a new primary suite to full second-story additions. The work overlaps more than people expect: foundations, framing, and roof tie-ins on an addition use the same trades and the same permitting process as a detached ADU. If you’re weighing an addition against an ADU on your lot, we can walk you through both with real numbers. Start at our home page if you want the full picture of what we do.
Availability, Coverage & Contact
Do you offer emergency ADU service?
Yes. We take emergency calls for active construction issues, such as water intrusion, a failed utility line, or a safety problem on an in-progress build. A live person answers the phone 24 hours a day, seven days a week, so you reach someone who can route the call. For a finished ADU under the 365-Day Done Right Promise, a call gets you a free return visit scheduled if the issue is covered. Emergency response times depend on the situation and where you are, so call and we’ll give you a real window rather than a guess.
How fast can you respond to a call?
You reach a live person immediately, day or night. For a routine estimate we typically schedule a site visit within a few business days. For an active emergency, we work out the fastest realistic arrival and give you a defined window rather than a vague “sometime today.” What we won’t do is promise a response time we can’t keep; that’s the whole reason the arrival window is written down.
What areas do you serve?
We serve Spring Valley and the surrounding Las Vegas Valley communities. That includes the neighborhoods around Spring Valley proper and nearby areas where ADU work is common. Because each Lodgewick location is independently owned and operated, the team you call for a Spring Valley project is the local one, familiar with Clark County permitting and the lots in this part of the valley. If you’re on the fence about whether your address falls in our service area, call and ask; we’ll tell you straight.
Do you work in the neighborhoods around Spring Valley?
Yes, and the lot conditions vary enough across Spring Valley that we’ve learned the patterns. The older subdivisions in Spring Valley often have larger back yards that suit a detached ADU, while the newer, denser tracts lean toward garage conversions and JADUs. Lots near the western edge of the valley sometimes sit on sloped ground, which changes foundation design. We factor all of this into the quote rather than discovering it mid-build.
How do I get started with an ADU in Spring Valley?
Call us, and we’ll set up a free site visit. Have a rough idea of whether you want a garage conversion, a detached unit, or a JADU, and we’ll take it from there. You’ll leave the first visit with a written price and a clear picture of the schedule, permits, and what the guarantee covers. If you’d rather think it over first, that’s fine too; the estimate is yours to keep either way.
Can I see examples of your ADU work?
Yes. Ask when you call and we’ll walk you through completed Spring Valley projects, the type of unit built, and the price range it landed in. Seeing a garage conversion next to a detached prefab unit tells you more about what you’re buying than any brochure. We won’t send you a portfolio of out-of-state builds and call it local work.
What makes Lodgewick ADU Builders different from other ADU builders in Spring Valley?
The written commitments are what set us apart. A written price before work begins, a real arrival window, a clean job site, a written guarantee on every job, and a live person answering the phone around the clock. A lodge is a small house on a larger property, which is exactly what an ADU is, so the name fits the work. Our technicians have up to 16 years of experience on ADU and conversion projects, and we work with leading prefab manufacturers including Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie. We don’t claim to be the only ADU builder in Spring Valley. We do claim that if the work isn’t right, we come back and make it right, in writing.
Reach Out
If you’ve been burned before by a price that changed at the door or a contractor who never showed, the answer is a written commitment you can point to. Call Lodgewick ADU Builders Spring Valley at (844) 780-4284 for a free estimate. Tell us what you’re picturing, whether it’s a garage conversion, a new detached ADU, or a JADU, and we’ll walk your lot, put a real number in writing, and schedule the work around your timeline. A live person answers, every hour of every day.
Have a question we didn’t cover? Call Lodgewick ADU Builders Spring Valley at (844) 780-4284.


